Local Fair Market Rate™ pricing for East Cobb, Marietta based on 30062 labor rates and material costs. Prices updated April 2026.
Quick Answer: The average cost of concrete driveway in East Cobb, Marietta, GA is $2,703 – $3,454 for a standard-grade project. Economy starts at $2,083; premium can reach $5,056.
Source: ClearCost Fair Market Rate data for 30062 — updated April 2026
Economy
$2,083 – $2,661
Materials: $1,341
Labor: $974 (16.5 hrs)
Standard
$2,703 – $3,454
Materials: $1,853
Labor: $1,151 (19.5 hrs)
Most common choice
Premium
$3,957 – $5,056
Materials: $2,627
Labor: $1,770 (30 hrs)
Local labor rates in East Cobb, Marietta (30062) average $59/hr for concrete driveway work. This rate reflects the East Cobb market and includes typical contractor overhead and profit margins. Labor accounts for 38% of the total project cost in this area.
East Cobb, Marietta (30062)
$2,703 – $3,454
National Average
$3,000 – $10,000
Prices in East Cobb, Marietta reflect local labor availability, material supplier pricing, and regional demand. For a full national breakdown, see our Concrete Driveway cost guide.
For standard passenger vehicles, 4 inches is the minimum recommended thickness. For heavy SUVs or light trucks, 5 inches provides added durability. For RVs or delivery trucks, pour at 6 inches with rebar reinforcement.
Wait at least 7 days before driving on new concrete, and ideally 28 days for full cure strength. Light foot traffic is okay after 24–48 hours.
Asphalt is cheaper upfront at $2–$5 per square foot installed, but requires resealing every 3–5 years. Concrete costs more initially but lasts 30–50 years with minimal maintenance.
Get a personalized estimate for East Cobb, Marietta
Our Fair Market Rate™ calculator uses 30062 labor rates and material costs to give you a detailed, project-specific price.