Concrete Driveway/Roswell (30076)
Roswell, Georgia — 30076

How Much Does Concrete Driveway Cost in Roswell, GA (30076)?

Local Fair Market Rate™ pricing for Roswell based on 30076 labor rates and material costs. Prices updated April 2026.

Quick Answer: The average cost of concrete driveway in Roswell, GA is $2,848$3,640 for a standard-grade project. Economy starts at $2,199; premium can reach $5,333.

Source: ClearCost Fair Market Rate data for 30076 — updated April 2026

Economy

$2,199$2,809

Materials: $1,387

Labor: $1,056 (16.5 hrs)

Standard

$2,848$3,640

Materials: $1,917

Labor: $1,248 (19.5 hrs)

Most common choice

Premium

$4,173$5,333

Materials: $2,717

Labor: $1,920 (30 hrs)

Local Labor Rates in Roswell

Local labor rates in Roswell (30076) average $64/hr for concrete driveway work. This rate reflects the North Fulton market and includes typical contractor overhead and profit margins. Labor accounts for 39% of the total project cost in this area.

How Roswell Compares to the National Average

Roswell (30076)

$2,848$3,640

National Average

$3,000$10,000

Prices in Roswell reflect local labor availability, material supplier pricing, and regional demand. For a full national breakdown, see our Concrete Driveway cost guide.

Concrete Driveway Cost Breakdown

National Cost Breakdown

National Average$6,000
Typical Range$3,000 – $10,000
Low End (single-car, plain concrete)$1,800 – $3,000
High End (stamped/colored, large area)$10,000 – $20,000+

Concrete Driveway FAQ

How thick should a concrete driveway be?

For standard passenger vehicles, 4 inches is the minimum recommended thickness. For heavy SUVs or light trucks, 5 inches provides added durability. For RVs or delivery trucks, pour at 6 inches with rebar reinforcement.

How long before I can drive on new concrete?

Wait at least 7 days before driving on new concrete, and ideally 28 days for full cure strength. Light foot traffic is okay after 24–48 hours.

Is concrete or asphalt cheaper for a driveway?

Asphalt is cheaper upfront at $2–$5 per square foot installed, but requires resealing every 3–5 years. Concrete costs more initially but lasts 30–50 years with minimal maintenance.

Get a personalized estimate for Roswell

Our Fair Market Rate™ calculator uses 30076 labor rates and material costs to give you a detailed, project-specific price.

Get Free Estimate